A major connector is now in place to link the Aiguille/Ficelle trail and the JDA/Chainon Manquant section. Thanks to this new link some major loop will be possible. The trail will be opened on June 1st.
The Trails starts on the other side of the big Aiguille bridge. It’s a 4 km long trail with a flowy design and long bridges.